International Waters learning Exchange & Resource Network

GEF IW Results Notes are more targeted aggregations of key results of projects in terms of stress reduction, process and change in environmental status in a concise way.

results notes
01 Jan 2016 - results-note - project: 615 2011 Result Notes - Mekong Water Utilization Results
1. Development of a transboundary hydrological model which is able to assess the impacts of the infrastructure (e.g., hydropower stations) in any of the tributaries of the Mekong River on the hydrology of the Mekong River. The model has been adopt...
01 Jan 2016 - results-note - project: 1537 2011 Results Note: Integrated Ecosystem Management in the Prespa Lakes Basin
Results note prepared by the GEF-UNDP IW project Integrated Ecosystem Management in the Prespa Lakes Basin for the 6th GEF Biennial International Waters Conference.
01 Jan 2016 - results-note - project: 3524 2011 Results Note: Sulu-Celebes Sea Sustainable Fisheries Management Project
This is a note prepared on results of the Sulu-Celebes Sea Sustainable Fisheries Management Project for the 6th GEF Biennial International Waters Conference in 2011.
01 Jan 2016 - results-note - project: 2517 2011 Results Notes - Integrated Ecosystems Management in the Binational Sixaola River Basin
2011-results-notes-integrated-ecosystems-management-in-the-binational-sixaola-river-basin 2011 Results Notes - Integrated Ecosystems Management in the Binational Sixaola River Basin ProjectDocument:Results INTERNATIONAL WATERS RESULTS NOTES ht...
01 Jan 2016 - results-note - project: 1247 2011 Results Notes - Addressing Land-Based Activities in the Western Indian Ocean (WIO-LaB)
Addressing Land-based Activities in the Western Indian Ocean
01 Jan 2016 - results-note - project: 113 2011 Results Notes - Albania and Former Yugoslav Republic of Macedonia- Lake Ohrid Conservation Project
2011-results-notes-albania-and-former-yugoslav-republic-of-macedonia-lake-ohrid-conservation-project 2011 Results Notes - Albania and Former Yugoslav Republic of Macedonia- Lake Ohrid Conservation Project ProjectDocument:Results INTERNATIONAL W...
01 Jan 2016 - results-note - project: 459 2011 Results Notes - Argentina- Coastal Contamination Prevention and Marine Management Project
2011-results-notes-argentina-coastal-contamination-prevention-and-marine-management-project 2011 Results Notes - Argentina- Coastal Contamination Prevention and Marine Management Project ProjectDocument:Results INTERNATIONAL WATERS RESULTS NOTE...
01 Jan 2016 - results-note - project: 922 2011 Results Notes - Baltic Sea Regional Project – Phase 1
Baltic Sea Regional Project (BSRP), Phase I
01 Jan 2016 - results-note - project: 1123 2011 Results Notes - Bulgaria: Wetland Restoration and Pollution Reduction Project
1. The project piloted restoration of 4035 ha of former marshes (double the original target) in two protected areas and brought under improvement management and protection 27 700 ha with globally significant biodiversity habitats. 2. Fifty-five sm...
01 Jan 2016 - results-note - project: 2750 2011 Results Notes - China Ningbo Water and Environment Project
1.Restored wetlands 2.Improved biodiversity and attracted a large number of migratory and resident bird species 3.Construction of Wetland Center
01 Jan 2016 - results-note - project: 1323 2011 Results Notes - China_ GEF Hai Basin Integrated Water and Environment Management Project
2011-results-notes-china_-gef-hai-basin-integrated-water-and-environment-management-project 2011 Results Notes - China_ GEF Hai Basin Integrated Water and Environment Management Project ProjectDocument:Results INTERNATIONAL WATERS RESULTS NOTES...
01 Jan 2016 - results-note - project: 2135 2011 Results Notes - China_ Guangdong Pearl River Delta Urban Environment Project
1. One of the inter-municipal environmental infrastructure pilots (Nangang WWTP - 75,000 m3/day) has been completed and put into operation since March 2011 to serve for two districts in Guangzhou 2. Guangdong Environmental Protection Bureau (GDEP...
01 Jan 2016 - results-note - project: 587 2011 Results Notes - CN-Ship Waste Disposal Project
1. Construction and commissioning of wastewater facilities in six ports. 2. Treatment of Chemically Contaminated Wastewaters. To meet the requirements of treating wastewater, the Port Authorities required a system that was robust and simple to ope...
01 Jan 2016 - results-note - project: 2758 2011 Results Notes - Coastal Cities Environment and Sanitation Project - under WB/GEF Partnership Investment Fund for Pollution Reduction in the LME of East Asia
1. One civil works contract under implementation. Other remaining contract is under procurement. Around US$500,000 disbursed by the end of Aug.2011. 2. The capacity of the Project Manager and Service Providers has been improved i.e. around 50 staf...
01 Jan 2016 - results-note - project: 1188 2011 Results Notes - Combating the depletion of living resources and coastal area degradation in the Guinea Current LME
2011-results-notes-combating-the-depletion-of-living-resources-and-coastal-area-degradation-in-the-guinea-current-lme 2011 Results Notes - Combating the depletion of living resources and coastal area degradation in the Guinea Current LME INTERNA...
01 Jan 2016 - results-note - project: 1531 2011 Results Notes - Coral Reef Targeted Research and Capacity Building for Management
Coastal and Marine Resource Management Project ProjectDocument:Results INTERNATIONAL WATERS RESULTS NOTES http://www.iwlearn.net/results
01 Jan 2016 - results-note - project: 3523 2011 Results Notes - CTI West Pacific East Asia Oceanic Fisheries Management Project
Specifically, the project has resulted in: -More accurate estimates of total catch by species from both countries -More accurate estimates of species-specific catches by major fishing gear types in both countries -The first size composition data f...
01 Jan 2016 - results-note - project: 2129 2011 Results Notes - Demonstrating and Capturing Best Practices and Technologies for the Reduction of Land-sourced Impacts Resulting from Coastal Tourism
1. Draft country assessment reports on sustainable tourism governance and management produced for five partner countries 2. Eight demonstration projects activated 3. High level of local stakeholder engagement at the demonstration site level, ind...
01 Jan 2016 - results-note - project: 614 2011 Results Notes - Demonstrations of Innovative Approaches to the Rehabilitation of Heavily Contaminated Bays in the Wider Caribbean
Demonstrations of Innovative Approaches to the Rehabilitation of Heavily Contaminated Bays in the Wider Caribbean
01 Jan 2016 - results-note - project: 2701 2011 Results Notes - Development and Adoption of a Strategic Action Program for Balancing Water Uses and Sustainable Natural Resource Management in the Orange-Senqu River Transboundary Basin
2011 Results Notes - Development and Adoption of a Strategic Action Program for Balancing Water Uses and Sustainable Natural Resource Management in the Orange-Senqu River Transboundary Basin

 

 

 

Filter results notes