Syr-Darya 1 aquifer
Aquifers
302,130 Km2
3,280 Km
- Enabling Country of the Transboundary Syr Darya Basin to Make Sustainable Use of their Ground Water Potential and Subsurface Space with Consideration to Climate Variability and Change - canceled (CEO PIF Clearance)
Finances | |
---|---|
Total cost | 21.00M US$ |
GEF allocation | 3.00M US$ |