The document library includes a wide array of outputs from projects (reports, presentations, case studies, terms of reference) as well as other content of interest to GEF International waters. Project managers and GEF International Waters staff are invited to give their feedback or submit case studies, ToRs, or other documentation to be included in the document library (info@iwlearn.org)
Documents |
---|
Filter: mid-term-evaluation |
09 feb. 2023
- mid-term-evaluation
- project: 9124
- Spanish
Mid-term evaluation |
13 sep. 2021
- mid-term-evaluation
- project: 6962
- English
Kura II Project Mid-term evaluation |
26 des. 2017
- mid-term-evaluation
- project: 3589
Module: Treasures of the Coral Triangle Minigraphics Volume 2 This series features 10 protected marine wildlife in the Coral Triangle and aims to raise awareness about species at risk. A bite-size and shareable version of the Philippine Protected Aquatic Posters, it highlights the importance, threats, laws,... |
01 jan. 2016
- mid-term-evaluation
- project: 2261
GloBallast Partnerships Project Mid-Term Evaluation (MTE) January 2012. Final Report. Prepared by R. Boelens |
12 feb. 2015
- mid-term-evaluation
- project: 3305
- English
[BCLME Programme II] Mid-Term Evaluation Report The mid-term evaluation BCLME SAPIMP project. |
16 jun. 2014
- mid-term-evaluation
- project: 176
Argentina-Bolivia: Implementation of the Strategic Action Program for the Bermejo River Binational Basin:MidTerm Evaluation Report (Unedited) This mid-term evaluation reviewed several documents that were provided by UNEP, OAS, GEF, COREBE and COBINABE. It also discussed the current state of the project as well as its performance per project component. Towards the end of the report, a s... |
30 mai 2014
- mid-term-evaluation
- project: 837
Conservation and Sustainable Use of the Mesoamerican Barrier Reef System (Belize, Honduras, Guatemala, Mexico): Project Brief The global objective of the Mesoamerican Barrier Reef Project is to enhance protection of the ecologically unique and vulnerable marine ecosystems comprising the MBRS, by assisting the littoral states to strengthen and coordinate national polici... |
31 jul. 2013
- mid-term-evaluation
- project: 3900
IW:LEARN Midterm Evaluation This Mid-Term Evaluation (MTE) has been undertaken in accordance with the Terms of Reference (ToR) presented in Annex 1 of this report and the project M&E plan. The evaluation process began in late December 2012 23 months into the planned 43 month... |
31 jul. 2013
- mid-term-evaluation
- project: 3900
IW:LEARN Midterm Evaluation This Mid-Term Evaluation (MTE) has been undertaken in accordance with the Terms of Reference (ToR) presented in Annex 1 of this report and the project M&E plan. The evaluation process began in late December 2012 23 months into the planned 43 month... |
31 okt. 2012
- mid-term-evaluation
- project: 2131
Mid Term Evaluation-OFM This Mid Term Evaluation report sets out findings, lessons learnt and recommendations for the UNDP/ GEF Pacific Islands Oceanic Fisheries Management Project (OFM Project). The report is developed in compliance with the terms of reference for the... |
25 jul. 2012
- mid-term-evaluation
- project: 2600
[MedPartnership] 2011 Mid-Term Report: The MedPan South Project "Working together for more effective Marine Protected Areas in the Mediterranean": The MedPAN South Project is a 4-year collaborative project aimed at improving the management effectiveness of Marine Protected Areas (MPAs) in the south and east of... |
25 jul. 2012
- mid-term-evaluation
- project: 2600
[MedPartnership] 2011 Mid-Term Report: The MedPAN South Project (French) In french language |
12 jul. 2012
- mid-term-evaluation
- project: 2188
PEMSEA Mid-term Evaluation Report It is the result of both good project design and innovative and adaptive management, which are producing commendable outcomes and beneficial social, economic and environmental impacts. |
01 jul. 2010
- mid-term-evaluation
- project: 2131
MTE Executive Summary-OFM II The MTE found that the Project was well designed and implemented, and has already had a significant impact on the immediate regional objectives (i.e. improved OFM in Pacific SIDS, and sustainable development of resources), and contributed to its w... |
08 jun. 2010
- mid-term-evaluation
- project: 842
EPSMO Interim Evaluation This is the Interim Evaluation Report for the GEF/UNDP/FAO Environmental Protection and Sustainable Management of the Okavango River Basin Project (EPSMO) which started in November 2004 after many delays. The EPSMO followed a Preparatory Phase wh... |
28 mai 2010
- mid-term-evaluation
- project: 2617
Tisza River- MTE An integral part of GEF-Mid-Size Project “Integrating multiple benefits of wetlands and floodplains into improved trans-boundary management for the Tisza River Basin”; The UNDP pilot and demonstration component will aim at develop... |
28 mai 2010
- mid-term-evaluation
- project: 340
PERSGA -Midterm Evaluation |
07 mai 2010
- mid-term-evaluation
- project: 985
Eastern Desert-Mid term evaluation GEF demonstrates through this project the potential of good management of Groundwater to release the stress on the use of surface water. The conclusions drawn from this evaluation was based on review findings conducted by the evaluation team. The ... |
06 mai 2010
- mid-term-evaluation
- project: 789
- English
[BCLME SAP] Mid-Term Evaluation Report The GEF independent mid-term evaluation report for the BCLME SAP project. |
06 mai 2010
- mid-term-evaluation
- project: 1460
Danube river basin(DRP) Midterm Evaluation for Danube capacity This report provides a mid-term evaluation of the UNDP/GEF funded Danube Regional Project. The report is delivered in compliance with the Terms of Reference developed by UNOPS, who are tasked with managing the DRP on behalf of UNDP. The evaluation... |