Workshop

ICPDR response to the stakeholder consultations process 2005

Based on the ICPDR Stakeholder Conference Report and the outcomes of the feedback received on the findings of the Danube Analysis Report 2004, the ICPDR response to the stakeholder consultations process 2005 (ICWD 235) has been prepared. Aim of this document is to summarise the recommendations and conclusions of the stakeholder consultation and to highlight the topics, where further discussion and /or cooperation with stakeholder groups is needed.

Download

PDF

English

02 May 2014